Almost Reconstructed

Work on the theater’s lobby, box office and concession area is almost done. It’s pretty sweet as the box office has been expanded and the concession area is a lot more user friendly. All of this is the end result of that burst pipe back in December.

Refloored and Recarpeted
The lobby has a new sub-floor and new carpeting.

Expanded and Tiled
The concession area has a new tile floor and is more self-contained.

Bigger BO!
The box office is now bigger (as in longer) and has a better entrance so it doesn’t interfere so much with the concession area.

Almost Reconstructed

One thought on “Almost Reconstructed

Leave a Reply

Your email address will not be published. Required fields are marked *